Immediate Actions
Taken (what did
you do to try and
fix/mitigate the
hazard? example: |
mopped up and
secured the area
of the incident)

| would like to see sound level testing done in Control Training room, especially from work station 3.

What do you
suggest asa
permanent / long
term solution?
(example:
contacted
Maintenance to
replace leaking
pipe)

Take significant steps to reduce the noise form the server (with out further reducing space behind work station 3), or
have the server moved somewhere else entirely.

Supervisor Assessment

Report Submitted
hee, ubmitted 2026/01/23 Supervisor Name * — Wainwright, Ronald (£14033)
eT Ifno,doyouwant eS" CoMtact employee to fllow process

No (02) to report a non-safety related issue and

to close this item?
close out below (01)

related issue? *

Safety staff measured the noise at the workstation. The noise levels varied between 56 and 63 dB depending on
closeness to the rack. These numbers fall within the acceptable levels. The desk has been moved as much as is
possible and the Manger of Systems has been requested to look at some method of reducing the sound.

Investigation
Findings *

Major/High Risk - Implement immediately
Minor/Low Risk or Moderate/Medium Risk - Implement within 14 days
Hazard Rating

Hazard source (if ice 994)
applicable)

Unsafe

condition(s) or

act(s) that

contributed to

incident

Are there existing
controls in place?

If Yes, please
describe