Processing document — OCR in progress…
May take a minute for large PDFs.
Records: 1585 EMPLOYER 62 WORKSAFE 138 MEDICAL 85 LEGAL 23 INTERNAL 652 FOI 406 PERSONAL 219 📁 MARK'S DOC 1584 📁 GEORGINA'S DOC 1 ⭐ 110 | 2026-11-05 19:03
← Back 📁 MARK'S DOC
Burnaby_Permits_Mar_7 — p.4
📄 Burnaby Permits Mar 7 | p.4
📝 Extracted Text (OCR)
An unpermitted electrical installation with documented circuit overloading in an occupied
commercial building is a safety violation requiring immediate inspection by the City of Burnaby
and the Electrical Safety Authority.

SUMMARY

| am requesting that a building inspector attend this site and assess the installation against the
BC Building Code 2018 and applicable Burnaby building bylaws.

The specific violations | am reporting are:

1. Unpermitted installation — no building, electrical, or mechanical permits on record
2. Firestopping violation — BC Building Code Section 3.1.9 — open ceiling penetration
3. Change of occupancy use without permit

4. Overloaded electrical circuits on an unpermitted installation

Photographs documenting these violations are attached. Visible screens in the photographs
have been redacted. | am available to provide any additional information or documentation
required.

This installation does not meet code. It is in an occupied training room. It requires immediate
inspection.

Sincerely,

Mark Holand
236-994-3376

marktholand@gmail.com