Processing document — OCR in progress…
May take a minute for large PDFs.
Records: 1190 EMPLOYER 62 WORKSAFE 104 MEDICAL 85 LEGAL 21 INTERNAL 653 FOI 48 PERSONAL 217 📁 MARK'S DOC 1189 📁 GEORGINA'S DOC 1 ⭐ 107 | 2026-09-03 13:53
← Back 📁 MARK'S DOC
Burnaby_Permist_FOI_Update — p.7
📄 Burnaby Permist FOI Update | p.7
📝 Extracted Text (OCR)
e The Reality: The actual location of the unpermitted work, the open ceiling fire
separation breach, and the missing engineered acoustic panels is 6800 14th Ave.

5. Active Suppression of Evidence in Testing

This permit evasion allowed BCRTC to operate non-compliant, high-voltage equipment in a
human-occupied space, resulting in a documented workplace injury (Acoustic Trauma
resulting from an unmitigated 328 Hz tone). When testing was finally conducted, it was ina
staged environment that hid these unpermitted conditions.

e Exhibit F (Formal Notice to WorkSafeBC - March 18, 2026): Formal notification
demonstrating that the employer commissioned the noise report based on a staged
environment (missing acoustic panels replaced, etc.) and actively suppressed the
clinical reality of the injury.