An unpermitted electrical installation with documented circuit overloading in an occupied
commercial building is a safety violation requiring immediate inspection by the City of Burnab
and the Electrical Safety Authority.

SUMMARY

| am requesting that a building inspector attend this site and assess the installation against tt
BC Building Code 2018 and applicable Burnaby building bylaws.

The specific violations | am reporting are:

1. Unpermitted installation —no building, electrical, or mechanical permits on record
2. Firestopping violation —BC Building Code Section 3.1.9 —open ceiling penetration
3. Change of occupancy use without permit

4. Overloaded electrical circuits on an unpermitted installation

Photographs documenting these violations are attached. Visible screens in the photographs
have been redacted. | am available to provide any additional information or documentation
required.

This installation does not meet code. It is in an occupied training room. It requires immediate
inspection.

Sincerely,

Mark Holand
236-994-3376