Processing document — OCR in progress…
May take a minute for large PDFs.
Records: 1114 EMPLOYER 62 WORKSAFE 102 MEDICAL 21 LEGAL 16 INTERNAL 656 FOI 42 PERSONAL 215 📁 MARK'S DOC 1113 📁 GEORGINA'S DOC 1 ⭐ 102 | 2026-07-04 12:56
← Back 📁 MARK'S DOC
FOREMED_FAX_MARCH_24-26_3-4 — p.1
📄 FOREMED FAX MARCH 24-26 3-4 | p.1
📝 Extracted Text (OCR)
varied 21628 PML Trensink 555-1212 ua

lifemark s& ents

Guideway Senice Person
Safety Ctl SC}

Physical emands Analysis Summary
Employer: 8 Raplé Transl Company ltd
Jol Title: Guideway Sence Person
Safety Category Safety ital (S)
Colour Visio: Not Regulred

Workitour/shts,

The Guldeway Servcemen work on a 12-month shift rotation Shifts cover all seven days ofthe week. Full-time shifts
Include ungald 30-minute lurch ane two 10-minute breaks, There are two ceparate parttime righehie avaiable, ene
65 hour shit and one 7.5 hour shit. The st rotation run as fellow:

Day Shift Monthly Rotation: 4 on/2 of, 3 on/2 of Son/S off, 4 an/8 off

‘ay Shift Hours: 7:00am-5:30pm (20 hours)

ight Shift Rotation: 4on/3 off

‘ight Shift ¢ Nous: 8:00pm-6:30am (L0 hours}

‘ight Shift 2 Rotation: n/2 off, 3 n/4 aff Nght Shik 2 Hours: :0Dpm-6:30am (30 hours)
Night Shift 3 Rotation: 3 en/Soff

Night Shift 3 Hours Tuesday/Wednesday/ Thursday 13:00pm 6:00am (6.5 hours}
Friday/Sturday:9:00pm-7:30am (20 hours)

ign Sit 4 Rotation: 4 an/3 of

Night Shift 4 ours: 10:00pr6:C0am (7.5 hours)

ob Purpose:

‘The Guideway Serviemen asta Technician Inthe repel and moinenunce of yard and malfline track special track work,
‘power i reaction all guldeway structure, drainage, walkways and fences. They also workan tasks that affect the overall
Integrity ofthe trac, including rail riding ceverboare replacement and guldetay cleaning, ballast work nd shop work
The day shift consists of visual inspections and emergency reps as needed. The night sift there lea 3-5 hour window
teaallow mejor cepars and malntenance projets tobe completed, Visual inspections af the tacks occu every 2 weeks
ans they lnvalve walking upto Ahr of tack tolaspect the tracks. Guldeway Serviceman are ressonsile for operating
equipment indlng rll borne equipment, cranes and revenue vehlles, Malntenance and repars may Indude LM-
Towering. el grinding or changing out 2 rll. In the event of a Red indi (tala stilling patron on tracks), the team i
cesponsile for recovering the train and repaling the gugewy.

Essent demande,

Tb oemands
ieee a he fs Giang sed arang
ener ocasen ocean
eensat wry 4 ve
laviiey lon arr aca [aT RE lstep Gitaroo
stn freuen fe

[Femme Te aaa aan Tae fa ep er ap pS IAT
tein treseron, Jove te cen power.
pied rwaen

[nttrstcamingfaresatsopte
[saree

eed