Original Safety Concern filing. Internal, through employer reporting portal. Before onset of worst symptoms (stabbing ea
Whatsapp Chats with instructor over the course of one weekend, informing of the ear pain and headaches, and looking to u
The "Vexatious" Fabrication (The Jan 26 "Smoking Gun") The decision to remove me from my position was made within 72 ho
The Employer Protest: Proof of Administrative Bad Faith The Employer Protest (Claim File pg. 456) represents a formal r
Dan Minster asking about having a server room tested, not a simulated control environment or classroom, or training cent
Part of the "Name and Address Shell Game". Correct address at the top of the letter, incorrect address and room descript
Name Shell Game. Server Room Noise Exposure Assessment
[Awaiting Analysis]
This is is part of the "Name and Address Shell Game". Calling the classroom a "server room", and providing the wrong add
Arcose Report Page 13
Arcose Report MAP. Shows correct address and correct room name. 6800 14 ave and Training Simulation Room. Proving the ot
Analysis / Notes: Evidence of Staged/Disassembled Test Environment This photograph, taken by Arcose Consulting during
The "Self-Incriminating" Internal Review This report by Jason Mayo (Manager, Safety and Environmental Compliance) was i
Start of Email thread between Jason Mayo and Terence Tang from Arcose. Terence had forwarded Jason an email I sent to Ar
This submission supplements my March 18, 2026 formal notice to WorkSafeBC and Arcose Consulting Ltd. regarding deficien
My photo taken on my last day of training on Jan 29, showing the configuration of the server panel, during the duration
Photo of the server taken on Jan 29, showing the server side panel (yellow arrow) removed and sitting behind the machine
WSBC Call to Employer 9 min after calling me, to inform BCRTC of the claim denial. 3 days before the offical letter exsi
Evidence of Real-Time Coordination and Pre-Notification This record, when cross-referenced with phone logs, establishes
lTo: PAYNE KEVIN <KEVIN_ PAYNE@BCRTC.BC.CA>; DOYLE MATT <MATT_ DOYLE@BCRTC.BC.CA>; WAINWRIGHT RON <RON_WAINWRIGHT@bcrtc
Importance: β CRITICAL (Medical/Technical Rebuttal) Analysis / Notes: The "Zero-Hour" Response This document serves
Call to Mark Holand from WSBC about claim denial, 3 days before letter exsisted.
Description: > "WorkSafeBC formally notifies me that technical evidence (the March 18/19 briefs) will be ignored due to
CIR β Critical incident response concluded The service provider, Amanda Sullivan, RCC, indicated that critical incide
FOI Cover Page